2018 → 2026

The signal was faint in 2020. Now it's too loud to ignore.

For years, almost no one wrote about towns pushing back. In the last year, the stories have accelerated from 664 in all of 2025 to more than 8,000 in 2026 so far. The design that answers them has been ready since 2023. Our goal is to finally bring it into the world.

US news stories on local data center opposition
Per year. Near zero for years, then thousands.
12
9
5
14
43
42
79
664
8,014*
2018’18
2019’19
2020’20
2021’21
2022’22
2023’23
2024’24
2025’25
2026’26
*2026 through Sep 11. Distinct stories in US national and local outlets with “data center” and an opposition word in the headline; syndicated copies counted once. Source · Regenerous Labs analysis of Media Cloud.
“

I didn't plan to come back to data centers. But I know there's a better way, and towns deserve an answer. So here I am.

JoAnn Garbin, Regenerous Labs
JoAnn Garbin
JoAnn Garbin
CEO & Co-founder, Regenerous Labs

JoAnn Garbin is CEO and co-founder of Regenerous Labs. At Microsoft she led the Datacenter of the Future initiative, bringing together a coalition of seven companies and thirty people to build a regenerative data center that is positive by design for the place it's in. Her team's discovery work, more than 200 interviews inside and outside the company including communities around the world, led to a full blueprint in 2023.

In 2023, the signal was too faint to move the industry to change. Now it can't be ignored and everyone is feeling the pressure of community pushback and moratoriums that her team predicted more than 5 years ago. Every week, industry leaders call JoAnn to ask how to make the regenerative datacenter happen. JoAnn and her partners at Regenerous Labs are on a mission to answer the call and demonstrate the model for a truly regenerative data center.

CEO · Regenerous Labs Microsoft · Datacenter of the Future Co-author · The Insider's Guide to Innovation at Microsoft Co-chair · The Digital Economist Regenerative Infrastructure Initiative
01The basics

Every question you ask AI lands in a building.

Every time you ask a chatbot a question, stream a show or back up your phone, the work happens in a data center: a building full of computers that run day and night. They use a lot of electricity, and they need cooling, often with water, to keep from overheating.

AI has set off the biggest building spree the industry has seen. New campuses cover hundreds of acres and can draw as much power as a city. And many of the towns being asked to host them have started saying no.

A clip from Datacenters and Decarbonization, Microsoft, October 2021. The video is about cutting carbon, but it opens on the neighbors. This is the video JoAnn's team created to win internal support for the Regenerative Datacenter of the Future.
The pushback, in numbers
$156B
in US data center projects blocked or stalled by local opposition in 2025.
Source · Data Center Watch
71%
of Americans oppose building an AI data center in their area. Nearly half strongly oppose it.
Source · Gallup, March 2026
1,174
US towns and counties named in a data center opposition headline, most for the first time this year.
Source · Regenerous Labs, Media Cloud
02What towns want

It isn't ideology. It's a list.

In Box Elder County, Utah, commissioners passed a moratorium on new data centers in June after months of public fights. In Independence, Missouri, residents went to court for the right to vote on a project their council had approved. In the New Mexico desert, a construction well for one campus has drawn 103 million gallons of fresh water, on an emergency permit.

Read enough meeting minutes and the same four worries come back, almost word for word. Each is reasonable. But they're often asked of the wrong people, and framed around what a town stands to lose. Better questions get better answers.

01
Will our state adopt a large load tariff?
Ask the state regulator, not the developer. The data center pays for its own load and the grid gets better. Ask it to bring its own power and you get gas turbines.
02
Will you make clean water, or use it up?
How much will you take, and how much will you put back?
03
What will it be like to live next to, during construction and after?
Construction can run for years. Ask about both.
04
How do we get a seat at the table before you pick a site?
Many developers no longer insist on NDAs. Ask to be in before the site and design are set.
01
Will my electric bill go up?
Someone pays for the new power lines and plants.
02
What happens to our water?
Cooling can take a lot of it, in places that don't have much.
03
What will it be like to live next to?
Years of construction, then the hum of fans.
04
Why are we hearing about this now?
Deals are often done before residents get a say.
03The answer

Same compute.
A different shape.

Every worry on that list has an answer, and it comes down to design. Today's campuses are new down to the chip, but to the neighbors they're the same windowless box, only bigger. The alternative doesn't wait on a breakthrough. Every piece is on the market now.

Instead of one giant campus at the edge of town, build small, distributed, interconnected sites. Make them in a factory, put their heat to use, configure them to work with the grid, and build a relationship with the town before the permit.

Today's default
REGENERATIVE DATA CENTER
One giant campus at the edge of town
Small 4–20 MW sites
Built on site, years of trucks and dust
Built in a factory, installed in months
Heat vented, fans running loud
Heat piped to greenhouses and homes
Strains the grid, or skips it with gas
Flexes to help steady the grid
Benefits offered after the fight
Relationship with the town before the permit
A few of the differences, not the whole design.
04The concept

Same corridor, before and after.

A mown grass corridor under high-voltage power lines, beside a neighborhoodToday
Mown grass under the lines, maintained at a cost.
The same power line corridor turned into wetland and meadow, with a data center under one planted bermWith a Regenerous Center
Wetland and meadow, with the compute under one planted berm. Same towers, same neighbors.
Illustrative, not a specific site.
05WHAT'S NEXT

It's not ours to build. It's ours to bring together.

At Regenerous Labs, we're refreshing the 2023 design, validating the supply chain, and delivering a playbook any developer or town can adopt. Nothing here needs inventing. The power equipment and the cooling are on the market, and the market has already made the business case.

What's missing is the connection. The pieces sit with dozens of companies that have never worked to one design. We're bringing them together into something a town can say yes to.

Illustration of a small town with a PIMBY welcome gate, residents cheering and a red carpet rolled out

The towns pushing back aren't against the future. They're asking for a better version of it. That version is ready now.

Three steps left.

Phase 01
01
Name the stack
Choose the parts and the companies that make them.
Phase 02
02
Vet it in the open
Run every part through the same public test:
  • Does it regenerate the land, water and air, or consume them?
  • What value does it create: physical, digital, social, knowledge, natural?
  • No offsets. A benefit somewhere else doesn't make up for harm here.
Phase 03
03
Design a first site
In partnership with the town from day one. This is a 30-year relationship.
Talk with us →
Sources · Data Center Watch, calendar-2025 report (Apr 2026) · Gallup (May 2026) · Regenerous Labs analysis of Media Cloud (Sep 2026) · Utah Public Radio (Jun 2026) · KCTV5 (Mar 2026) · Searchlight New Mexico (Sep 2026) · Innovating Out Loud #16, #34, #38